1972S Bakerloo Line Twisted Cable Modification

Case Study: 1972S Bakerloo Line Twisted Cable Modification
Customer: Metronet Engineering
Work Location: Stonebridge Park Train Depot
Operators: LUL
Scope of Work: Removing & Replacing twisted and screened pair cables
Contract Award: November 2008
Contract Completion: June 2010
Description: TXM provided a team to remove and replace twisted and screened paired cables on the 1972S Bakerloo line fleet