1972S Bakerloo Line Twisted Cable Modification

Customer: | Metronet Engineering |
Location: | Stonebridge Park Train Depot |
Operator(s): | LUL |
Contract: | Removing and replacing twisted and screened pair cables. |
Awarded: | November 2008 |
Completed: | June 2010 |
Description: | TXM provided a team to remove and replace twisted and screened paired cables on the 1972S Bakerloo line fleet. |